top of page

Changing Nuts, Rods and Brackets

​

TMDr checks the condition of the nuts, rods and brackets before replacing or changing them.

​

  1. Install New Components: Place the new nuts, rods, and brackets into their respective positions. Depending on the specific equipment or structure, you may need to use nuts and bolts to secure the rods and brackets in place.

  2. Tighten Securely: Ensure that all nuts and bolts are tightened securely, but be careful not to overtighten, which could damage the components.

  3. Check Alignment: If the rods and brackets are part of a larger structure, use a level to check their alignment to ensure stability and safety.

  4. Test and Verify: Once the new components are installed, test the equipment or structure to verify that everything is functioning as expected.

Changing Nuts and Rods
Changing Nuts and Rods

Before

Changing Nuts and Rods

Before

Changing Nuts and Rods

After

Changing Nuts and Rods

Before

Changing Nuts and Rods
Changing Nuts and Rods

TESTIMONIALS

Logo

We would highly recommend The Marina Doctor for specialty marine services. The team provide reliable and cost effective support. Their recommendations and sound knowledge within the industry assist us in meeting the needs of our client. We thank them for their safe and professional delivery of projects. As we enter a new year, there are a number of additional projects in the pipeline that we will require solutions for, in upgrading and repairing our clients assets, we will continue to rely on The Marina Doctor for their effective services.

John Dichiara, Sydney Airport

CONTACT US

Please use the following contact information to get in touch with TMDr

Marina Maintenance Services

Contact Us

Address: Sydney, New South Wales

Thanks for submitting!

bottom of page